Home/For General Contractors
Sheet 01 · Built To Protect Your Schedule, Not Audit Your Work
A construction document review for general contractors is an independent check of the issued design documents — drawings and specs — run before anything is priced or built. It's not scoped to grade your workmanship or your means and methods; there isn't any yet at this stage. It's scoped to catch the cross-discipline conflicts in what you're being asked to build from, before your crew finds them in the field and before a dispute starts over whose number the fix comes out of.
$50K Exposure Guarantee · No Minimum Construction Value · 48-Hour Turnaround
What This Isn't
This review runs on the issued set before pricing or construction starts — before there's field work, a sub's install, or a punch list to grade. It reads the drawings and specs, not the job site. The goal is the same one your own coordination review has: fewer conflicts making it to the field. This is one more set of eyes catching them earlier, not a second pass judging your crew's performance.
Not A Performance Audit
Nothing about your crew, your subs, or your install is in scope — there's nothing built yet to review.
Not Means & Methods
How you sequence, staff, or execute the work is entirely yours. This stays on the issued documents.
Not A Substitute For Your Coordination Review
Your team's pricing-focused coordination pass still runs. This one runs alongside it, earlier and independently.
What Gets Caught Before You're On The Hook
The issued set is read once, in full, by reviewers who've drawn these sets themselves — not a keyword search, not a single-discipline pass. Four things get checked on every construction document review:
SUBMITTAL CROSS-CHECKS
Specified equipment and finishes checked against what's actually drawn and scheduled — before it's priced and someone has to eat the swap.
SPEC-TO-DRAWING ALIGNMENT
Written spec sections read against the sheets they're paired with — the mismatches that turn into an RFI mid-install.
CODE COMPLIANCE
Fire ratings, egress, and life-safety call-outs checked for consistency sheet to sheet, before an inspector stops the work.
MEP COORDINATION
Structural, mechanical, electrical, and plumbing sheets cross-read for routing and clearance conflicts, before a sub finds them with a ladder in hand.
The output is a written findings report — every conflict located by sheet and detail, severity-ranked (High/Med/Low), with an estimated dollar exposure and schedule impact on each — plus a live walkthrough meeting. See the full four-step process on the homepage, or the complete step-by-step procedure and turnaround detail on what happens during a construction document audit.
Where This Sits
vs. Architect QC
DESIGN INTENT VS. FIELD-READY CLARITY
The architect's QC checks the set against design intent. This review is a separate pass looking for what turns into an RFI or stop-work once your crew is building from it. What owner-side QA/QC actually means →
vs. Your Coordination Review
PRICING THE WORK VS. FLAGGING THE RISK IN WRITING
Your coordination review is scoped to price the work accurately and keep subs from colliding in the field. This one is scoped to put cross-discipline conflicts in writing, severity-ranked, before pricing locks in.
vs. BIM Clash Detection
GEOMETRY VS. THE ISSUED PAPER
Clash detection catches modeled elements overlapping in 3D. This review reads the issued set itself — specs, notes, and sheet-to-sheet conflicts a coordinated model never surfaces. Full comparison →
Preempt Global also gets compared against clash-list and checklist software directly: see vs. RediCheck, vs. LightTable AI, and vs. CHECKSET.
Why This Matters To You
the cost of a conflict reaching the field, across the industry
A clash caught in a construction document review costs one redline and five minutes. The same conflict caught in the field averages $18,400 and a 12-day schedule slip — and the dispute over whose number absorbs it. If your project has multiple trades sharing tight coordination — any size, no minimum construction value — that's the gap this review is built to close before your crew ever sees it.
The Guarantee
If a construction document review doesn't surface at least $50,000 in documented cost exposure, no one pays for it — no partial credit, no fine print, on every pricing tier. On a set of this size and complexity, there's always something to find before it becomes a field problem with your name on it.
See Full Pricing Tiers →Before You Ask
No. It runs on the issued design documents — drawings and specs — before pricing or construction starts, which means before there's any GC work to audit. It's scoped to catch conflicts in what you're being asked to build from, not to grade what you've built.
Because a cross-discipline conflict caught on paper costs one redline. The same conflict caught in the field costs an RFI, a stop-work, and a dispute over whose number it comes out of — usually the GC's, even when the drawings caused it. Fewer conflicts reaching the field means fewer of those conversations.
The GC's coordination review is scoped to price the work accurately and keep subs from colliding once you're building — real, necessary, and not replaced here. This review reads the issued documents independently, before your team is committed to a price or a schedule built on them, and catches what a pricing-focused pass isn't scoped to look for.
Most often the owner or the owner's rep, since it's an owner-paid review that reports to the owner. GCs increasingly ask for one during preconstruction anyway, specifically because fewer design conflicts reaching the field means fewer disputes over cost and schedule that land on the GC's side of the table. See the breakdown built for owners →
Pre-bid or at GMP is the ideal window — findings land before the number is locked in. It's just as useful at any bulletin, addendum, or RFI-driven revision after that, since a revised issued set can introduce the same conflicts a first one did.
Any set with multiple trades sharing tight coordination — office, manufacturing, warehouse and distribution, healthcare, higher-ed, data centers, multifamily residential, and other complex, multi-discipline builds. There's no minimum construction value; the deciding factor is coordination complexity, not project size.
Sheet 01 of 01 — Last Call
Book a 30-minute demo. Nothing's shared until the NDA is signed, and nothing's billed unless we find something worth the fee.
See the full pitch, pricing, and process on the Preempt Global homepage.